Infographic for Finestrelles

09.05.14 | Today the infographic that we designed from the studio for explaining the installation of the LED’s beacon system has been applied. This system is powered by wind and photovoltaic energy, in the path goes from Casal del Barri de La Mercè to the cross with the path of Camí de Finestrelles and the path of Access to the Carretera de Les Aïgues. The infographic works for divulge tasks as academic area as business. The project has been drive by Ajuntament de Barceona, the Agència d’Energia de Barcelona and the companies Navitas Paradigma and Uptive.

 

Mini aerogenerador de Finestrelles

Luces de balizamiento del Camí de Finestrelles

Placas solares en Finestrelles

Plafón infografía del sistema en Finestrelles

Plafón infografía explicación de los componentes en Finestrelles

diseño gráfico plafon 1 infografia para instalación mini eólica

diseño gráfico plafón 2 infografía Finestrelles energía mini eólica

© Imatges fāctil

 

Share